Monday, August 3, 2009

Construction Update

We are well into the construction process now. The roof is up, except for the shingles. The inspector came today, so they should be starting with the shingles soon. They have also blocked of the windows in the girls' room and the bathroom since that wall will now be an interior wall instead of an exterior one. I will be glad when they get that work finished off. Not much on the plywood look, but it does mean the work is getting done. All of the electrical wiring was done this weekend, too. The contractor tells us that drywall should be up by the end of the week, and everything should be finished in about 4 weeks. We have been VERY pleased with his work so far. He is doing everything he can to get this done as quickly and as well as possible. Photos are in a slideshow below.

1 comment:

a Tonggu Momma said...

It looks great! Won't be long now...